Drilling Mud Tank

Drilling Mud Tank

Drilling Mud tank is the a multi-tank mud system, it’s also named solids control system, or mud circulation system for the oil gas drilling rigs. GN oil drilling mud system is available for different oil drilling rig sizes from 250HP to 3000 HP with different capacity.
Send Inquiry
Product Introduction

Drilling Mud Tanks are large steel containers used for storing, processing, and preparing drilling fluids (mud), and they are a key component of the drilling circulation system.

 

Product advantages

 

High Strength: The use of thickened Q345 steel plates combined with full-penetration welding enables the tank body to withstand 1.5–2.0 MPa of pressure.

Corrosion Resistance: The inner wall is treated with Sa 2.5-grade sandblasting and a 250–320 μm epoxy coating, making it resistant to corrosion.

Large Capacity: The tank provides an effective volume of 30–70 m³, ensuring sufficient mud supply for continuous drilling operations.

Safety: The platform has a load-bearing capacity of 2.0 kN/m² and is equipped with anti-slip grating and guardrails to ensure safe operation.

 

Product Specification

 

The drilling mud tank system includes the following solids control equipment:

  1. Shale Shaker for primary solids control at 100 microns.
  2. Desander for second-stage solids control, removing cuttings down to 40 microns.
  3. Desilter for third-stage solids control, removing cuttings down to 20 microns.
  4. Decanter Centrifuge for fine solids separation in the 2–7 micron range.

 

The drilling mud tank system includes the following types of mud tanks, depending on their function:

  1. Shale Tank (Silting Mud Tank)
  2. Active Mud Tank
  3. Suction Mud Tank
  4. Mixing Mud Tank
  5. Storage Mud Tank

 

Product Details

 

image001001
image003001

 

FAQ

 

Q: How can we obtain the latest product quotation?

A: Please contact us through the information provided on the website-via email or phone-and let us know the type, capacity, and quantity of mud tanks you need. Our sales team will provide a detailed quotation within 24 hours.

Q: Can the mud tank be customized according to the rig layout?

A: Yes, we support customized design based on site space, process layout, and interface orientation.

Q: What is the typical production time for a mud tank?

A: Standard models are completed within 15–25 days, while customized models require around 25–35 days. Urgent orders can be expedited.

Q: Can you provide 3D drawings for engineering evaluation?

A: Yes, we can provide STEP, DWG, PDF, and other formats.

Q: Do you offer on-site technical support?

A: Depending on customer needs, we can provide remote guidance or dispatch engineers to the site for installation and commissioning.

 

Hot Tags: drilling mud tank, China drilling mud tank manufacturers, suppliers, factory, super mud gas separator, shale shaker in drilling, mud shaker, shale shakers, shale shaker drilling, Drilling Mud Gun

Send Inquiry

whatsapp

Phone

E-mail

Inquiry